此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

glazed tile roll forming (sl28-220-1100)

 

  

Overview:
Feed into Platform
Auto-cut steel plate forming device
Hydraulic System
Imported computer control system movement
High-Precision Automatic Measuring the length of the system
Production line speed :10-18 m / minute, 3500 square meters / 8 hours
For raw material: color steel plate, aluminum, galvanized sheet.

optional equipment:
A variety of tonnage general core support
Hydraulic automatic decoiler 


SL1100 Arc bias glazed tile roll forming machine equipment process flow:


Equipment and personnel needed for the venue:

1, formation of cement floor
2, not less than 5 tonnes lifting mechanism
3, provide storage space for raw materials
4, providing space for the finished product placement
5, providing vehicle access road
6, the operator: 2, operatives and porters

 

浏览相关信息:glazed tile forming machine

 
上一篇 Arc bias glazed tiles(sl28-220.. 下一篇没有了